Communicators

are winners!

News

01.12.2020
Endeavour Silver Drilling Intersects High-Grade Gold-Silver Mineralization at the Bolanitos Mine in Guanajuato, Mexico

VANCOUVER, British Columbia, Dec. 01, 2020 - Endeavour Silver Corp. (https://www.commodity-tv.com/ondemand/companies/profil/endeavour-silver-corp/) (NYSE: EXK) (TSX: EDR) announces that exploration drilling continues to intersect high-grade gold-silver mineralization in the Melladito and San Bernabe vein systems at the Bolanitos mine in Guanajuato, Mexico. Since drilling resumed in June, a total of 22 holes have been drilled of which 11 holes and 22 mineralized intervals returned high grades over mineable widths (view Melladito longitudinal section here).

 

Drilling highlights include the following intersections along the Melladito vein:

 

-          12.76 grams per tonne ( gpt ) gold and 55 gpt silver over 4.5 met re s (m) true width (1,076 gpt or 31.4 oz per ton (opT) silver equivalents (AgEq) over 14.8 feet (ft) using an 80:1 silver:gold ratio) including 0.4 m grading 43.5 gpt gold and 171 gpt silver (3,651 gpt AgEq or 106.4 opT over 1.3 ft) in hole BN-58

-          0.51 gpt gold and 491 gpt silver over 2.7 m true width (531 gpt or 15.5 opT AgEq over 8.9 ft) including 0.4 m grading 1.74 gpt gold and 2,220 gpt silver (2,359 gpt AgEq or 68.8 opT over 1.3 ft) in hole BN-52

 

Drill holes BN-40, 42, 57 extend the Melladito vein mineralization further to the north and at depth, drill holes 50, 52, 58 extend the Melladito vein mineralization further to the east and near surface to possibly connect with the San Pablo mine workings, and drill holes 45, 47 extend the Melladito vein mineralization another 200 m north on the other side of the San Ramon and Providencia shafts. The Melladito mineralized zone now measures up to 200 m long by more than 250 m deep, still open at depth and to the north.

 

An initial three holes were drilled along the San Bernabe vein system highlighted by hole BN-59 which returned 7.91 gpt gold and 12 gpt silver over a 2.7 m true width (645 gpt AgEq or 18.8 opT over 8.9 ft).

 

Drilling results are summarized in the following table:

Hole

Structure

From

True

Au

Ag

AgEq

(m)

(m)

(gpt)

(gpt)

(gpt)

BN-40

Melladito

272.80

1.6

0.64

79

131

Including

272.80

0.9

0.57

132

177

FW Medallito

292.40

4.4

3.88

5

316

Including

294.50

0.4

12.90

14

1,046

BN-42

Melladito

296.90

4.3

3.70

8

304

Including

298.15

0.4

7.82

10

636

FW Melladito

334.55

1.9

2.12

5

174

Including

336.85

0.6

3.76

6

307

BN-44

San Ignacio?

151.00

1.5

0.23

163

181

Including

154.45

0.1

1.34

784

891

BN-45

Melladito

60.40

2.0

0.10

110

118

Including

63.15

0.3

0.15

253

2.65

Melladito

67.55

1.0

0.28

260

282

Including

68.55

0.4

0.66

660

713

San Ignacio?

111.25

2.6

1.90

357

509

Including

111.25

0.7

3.73

1,085

1,383

BN-47

Melladito

86.95

7.6

0.73

213

272

Including

93.25

0.4

1.13

713

803

FW Melladito

103.75

3.5

0.17

12

25

San Ignacio

167.45

5.1

1.48

243

361

Including

171.10

0.3

4.30

615

959

BN-50

HW Melladito

174.30

1.2

0.89

506

577

Including

175.10

0.4

2.01

1,390

1,551

Melladito

180.05

2.7

3.37

110

380

Including

180.30

0.6

8.47

236

914

Bolanitos-San Miguel?

220.60

2.5

5.52

20

464

Including

222.35

0.3

14.50

18

1,178

Bolanitos-San Miguel?

237.50

0.7

5.70

1,226

1,682

Including

237.50

0.2

15.95

3,460

4,736

BN-52

Melladito

212.50

2.7

0.51

491

531

Including

214.75

0.4

1.74

2,220

2,359

BN-56

FW Melladito

323.25

1.5

2.24

3

182

Including

323.25

0.3

9.87

11

801

BN-57

Melladito

283.10

3.7

3.89

4

315

Including

287.50

0.5

20.40

21

1,653

FW Melladito

300.70

1.1

2.01

4

165

Including

300.70

0.5

3.09

5

252

BN-58

Melladito

52.00

2.5

0.83

218

285

Including

52.60

0.3

1.90

723

875

Bolanitos

101.80

1.1

2.06

89

254

Including

102.25

0.4

5.48

217

655

Bolanitos

114.70

4.5

12.76

55

1,076

Including

116.20

0.4

43.50

171

3,651

BN-59

San Bernabe

106.55

2.7

7.91

12

645

Including

108.60

0.4

9.96

19

816

 

Silver equivalents are calculated at a ratio of 8 0:1 silver: gold. All widths are estimated true widths.

 

Qualified Person and QA/ QC - Godfrey Walton, M.Sc ., P.Geo ., Endeavour President, is the Qualified Person who reviewed and approved this news release and supervised the drilling programs in Mexico. A Quality Control sampling program of reference standards, blanks and duplicates is used to monitor the integrity of all assay results. All samples are split at the local field office and shipped to SGS Labs, where they are dried, crushed, split and 250 gram pulp samples are prepared for analysis. Gold is determined by fire assay with an atomic absorption (AA) finish and silver by aqua regia digestion and ICP finish, over-limits by fire assay and gravimetric finish.

 

About Endeavour Silver – Endeavour Silver Corp. is a mid-tier precious metals mining company that owns and operates three high-grade, underground, silver-gold mines in Mexico. Endeavour is currently advancing the Terronera Mine project towards a development decision and exploring its portfolio of exploration and development projects in Mexico and Chile to facilitate its goal to become a premier senior silver producer.  Our philosophy of corporate social integrity creates value for all stakeholders.

 

SOURCE Endeavour Silver Corp.

 

Contact Information:

Galina Meleger, Director, Investor Relations

Toll free: (877) 685-9775

Tel: (604) 640-4804

Email: gmeleger@edrsilver.com

Website: www.edrsilver.com

 

In Europe:

Swiss Resource Capital AG

Jochen Staiger

info@resource-capital.ch 

www.resource-capital.ch

 

Follow Endeavour Silver on Facebook, Twitter, Instagram and LinkedIn

 

Cautionary Note Regarding Forward-Looking Statements

 

This news release contains “forward-looking statements” within the meaning of the United States private securities litigation reform act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Such forward looking statements and information herein include but are not limited to statements regarding Endeavour’s anticipated performance in 2020 including changes in mining operations and production levels, the timing and results of various activities and the impact of the COVID 19 pandemic on operations. The Company does not intend to and does not assume any obligation to update such forward-looking statements or information, other than as required by applicable law.  

 

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, production levels, performance or achievements of Endeavour and its operations to be materially different from those expressed or implied by such statements. Such factors include but are not limited to the ultimate impact of the COVID 19 pandemic on operations and results, changes in production and costs guidance, national and local governments, legislation, taxation, controls, regulations and political or economic developments in Canada and Mexico; financial risks due to precious metals prices, operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of mineral exploration, development and mining; the speculative nature of mineral exploration and development, risks in obtaining necessary licenses and permits, and challenges to the Company’s title to properties; as well as those factors described in the section “risk factors” contained in the Company’s most recent form 40F/Annual Information Form filed with the S.E.C. and Canadian securities regulatory authorities.  

 

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued operation of the Company’s mining operations, no material adverse change in the market price of commodities, mining operations will operate and the mining products will be completed in accordance with management’s expectations and achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.  

 

Source: Endeavour Silver Corporation

 



NEWSLETTER REGISTRIERUNG:



Aktuelle Pressemeldungen dieses Unternehmens direkt in Ihr Postfach:
Newsletter...

Mitteilung übermittelt durch IRW-Press.com. Für den Inhalt ist der Aussender verantwortlich.

Kostenloser Abdruck mit Quellenangabe erlaubt.