Communicators

are winners!

News

03.05.2016
Cypress Reports Assay Results from Clayton Valley Lithium Project, Nevada

 

 

 

 

Cypress Reports Assay Results from Clayton Valley Lithium Project, Nevada

 

Vancouver, BC - Cypress Development Corp. (TSX-V: CYP) (OTCBB: CYDVF) (Frankfurt: C1Z1) (“Cypress” or the “Company”) May 03, 2016 is pleased to announce, further to its news release April 5, 2016, that the Company has received lithium assays from Cypress’ ongoing Phase 2 sampling program at its 1320 acre Clayton Valley Project located in Esmeralda County, Nevada.

 

Cypress Clayton Valley Lithium Project, Nevada claims map:
http://www.cypressdevelopmentcorp.com/i/maps/Clayton-Test-Wells-Plan-Map.jpg

 

Cypress' Clayton Valley Project is located on the south flank of "Angel Island" and immediately southeast of the Albemarle Silver Peak lithium mine. Cypress' Clayton Valley claims share their western boundary with claims controlled by Pure Energy Minerals. Pure Energy has identified a lithium resource at its northern resource area that is located to the immediate west of Cypress' property boundary.

 

The Albemarle Silver Peak mine is the only operating brine based lithium mine in North America. The Silver Peak mine began operations in 1967 to mine lithium by low cost evaporation ponds and has produced lithium since then. The lithium concentration in the production brines were reported in 2001 to average 160 ppm lithium (160 mg/litre) (Garrett Report, 2004). Cypress' highly prospective "Glory" and "Angel" claims are located within 0.5 miles (<1000m) south of current and past producing lithium brine wells belonging to the Albemarle Silver Peak Mine.

 

Cypress Phase 2 Clayton Valley Project Exploration Results

 

Phase 1 surface sampling of the claystones at Cypress' Clayton Valley Project was completed at the end of January in an area within the northwest portion of the property on the west flank of Angel Island. The outcropping claystone likely represent uplifted portions of the stratigraphy within which the lithium brines of the basin are produced.

 

The assays results encountered by Cypress suggest a strong possibility of an essentially continuously mineralized volume of lithium in claystones at surface on extensive portions of Cypress' Clayton Valley property. The Phase 2 sample results to date, including January’s Phase 1 results, show 2 kilometers of north-south strike of outcropping claystones that assay approximately 1,000 ppm lithium on average.

 

An additional batch of samples have been collected from the most northern portion of the northwest area of Cypress’ claim group to complete the Phase 2 sampling of that area. The new samples have been submitted to ALS Chemex in Reno for processing.

 

Cypress Clayton Valley Phase 2 lithium sampling sites map, Nevada:

http://www.cypressdevelopmentcorp.com/i/maps/CYP-Clayton-Phase-2.jpg

 

The tables below show Phase 2 assay results from the North, Central, Southeast and Southwest areas of Cypress’ Clayton Valley property.

 

North Area Assays

 

 

Central Area Assays

 

 

SE Area Assays

 

 

SAMPLE ID

Li ppm

 

SAMPLE ID

Li ppm

 

SAMPLE ID

Li ppm

 

243681

1680

 

243671

780

 

123190

420

 

243682

1150

 

243672

830

 

123191

470

 

243684

780

 

243673

730

 

123192

750

 

243685

190

 

243674

700

 

123193

500

 

243686

510

 

243675

640

 

123194

650

 

243687

1300

 

243676

630

 

123195

640

 

243688

1060

 

243677

440

 

123196

610

 

243689

1040

 

243678

610

 

123197

690

 

243690

960

 

243679

730

 

123198

620

 

243691

1620

 

243680

500

 

123199

770

 

Average

1029

 

Average

659

 

123200

870

 

 

 

 

 

 

 

123201

650

 

 

 

 

 

 

 

123202

590

 

 

 

 

 

 

 

123203

590

 

 

 

 

 

 

 

123204

670

 

 

 

 

 

 

 

123205

860

 

 

 

 

 

 

 

123206

860

 

 

 

 

 

 

 

Average

659.4

 

 

Southwest Area Assays

 

 

 

 

 

SAMPLE ID

Li ppm

 

 

Li ppm

 

 

Li ppm

 

123146

1030

 

123161

1230

 

123176

860

 

123147

1040

 

123162

700

 

123177

630

 

123148

1140

 

123163

800

 

123178

790

 

123149

1060

 

123164

790

 

123179

690

 

123150

1120

 

123165

170

 

123180

450

 

123151

1130

 

123166

770

 

123181

480

 

123152

1120

 

123167

770

 

123182

810

 

123153

1130

 

123168

690

 

123183

840

 

123154

1140

 

123169

950

 

123184

860

 

123155

1140

 

123170

1290

 

123185

470

 

123156

750

 

123171

810

 

123186

860

 

123157

1130

 

123172

870

 

123187

450

 

123158

910

 

123173

840

 

123188

380

 

123159

1130

 

123174

850

 

123189

130

 

123160

680

 

123175

820

 

Average

834.1

 

*NOTE: (Li=Lithium, ppm=parts per million, 1 ppm=1 milligram per litre)

 

Lithium Leachability Study

 

A number of samples from these current results are now being run by additional assay procedures to provide further data on the favourable leachability potential of lithium from the mineralized claystones.

 

Cypress’ Phase 3 program will include the drilling of  shallow auger holes targeted to provide initial subsurface data and assays under areas of strongly lithium mineralized salty claystone outcrops. The auger holes are planned to test the depth of lithium in claystones and will be sampled on composite 5 foot intervals.

 

Cypress Clayton Valley Project proposed auger and drill hole map:

http://www.cypressdevelopmentcorp.com/i/maps/CYP-Clayton-Drill-Plan-Map-small-apr16.jpg

 

The surface sampling and reconnaissance geologic results received by Cypress to date are viewed as being highly encouraging for the presence of lithium rich brines within the subsurface aquifers below the mineralized claystone. In Cypress’ view, lithium rich brines are likely to be found below the water table below the mineralized outcrops and may be especially well developed along the arcuate fault zones where fracturing will have increased the permeability of the rock section.

 

In preparation for a planned Phase 3 program, Cypress Development has filed a Notice of Intent permit with the BLM (Bureau of Land Management), Nevada covering a planned four hole drill program targeting lithium brines at the Company's Clayton Valley Project (see news release April 21, 2016).

 

Clayton Valley is located within the Basin and Range Province in southern Nevada and is an internally drained, fault bounded and closed basin. Basin-filling strata compose the aquifer system which hosts and produces the lithium-rich brines.

 

Quality Control and Quality Assurance

 

All samples were assayed by ALS Chemex using a four acid digestion / ICP-Mass Spec method. Blind sample blanks are being inserted into the sample sequences at a rate of approximately 1 per 20 samples. 

 

Robert Marvin, P.Geo, Exploration Manager for Cypress Development Corp. is the Qualified Person as defined by National Instrument 43-101 and has approved of the technical information in this release.

 

About Cypress Development Corp.:

 

Cypress Development Corp. is a publicly traded lithium and zinc-silver exploration company developing projects in Nevada, U.S.A.

 

Cypress Development Corp. has approx. 24.1 million shares issued and outstanding.

 

To find out more about Cypress Development Corp. (TSX-V: CYP), visit our website at www.cypressdevelopmentcorp.com.

 

CYPRESS DEVELOPMENT CORP.

 

“Don Huston”

                                                                     

DONALD C. HUSTON

President

 

For further information contact myself or:
Don Myers

Director
Cypress Development Corp.
Telephone: 604-687-3376
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@cypressdevelopmentcorp.com

 

Suite 1610 - 777 Dunsmuir Street, Vancouver, BC, Canada, V7Y 1K4

www.cypressdevelopmentcorp.com

 

TSX-V Trading Symbol: CYP

Email: info@cypressdevelopmentcorp.com

 

 

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

 

This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.



NEWSLETTER REGISTRIERUNG:



Aktuelle Pressemeldungen dieses Unternehmens direkt in Ihr Postfach:
Newsletter...

Mitteilung übermittelt durch IRW-Press.com. Für den Inhalt ist der Aussender verantwortlich.

Kostenloser Abdruck mit Quellenangabe erlaubt.